Two lanes will be open with reduced shoulders. Adjustments to be made include "hiring contract labor when needed and through a lease versus purchase approach to equipment," Tyler said. Idaho Law: Restrictions to Tire Equipment 11 x 300 lbs = 3300, lbs per tire. Idaho Transportation Department Phone (208) 765-3717 Fax (208) 765-0493 Email: contactus@postfallshd.com Summer Hours: April 1 - November 11 6 am - 4:30 pm | M - TH Winter Hours: November 14 - March 31 6 am - 2:30 pm | M - F SPUIs control traffic at one signalized point. Highways: Transportation Systems x- [ 0}y)7ta>jT7@t`q2&6ZL?_yxg)zLU*uSkSeO4?c. R -25 S>Vd`rn~Y&+`;A4 A9 =-tl`;~p Gp| [`L` "AYA+Cb(R, *T2B- Post Falls and Rathdrum, with agricultural uses still being practiced within the corridor. Idaho Falls. Go to http://pathweb.pathwayservices.com/idaho and view the vans video there. Use the selection procedure below to select, view and download ATR or WIM reports. The design team reviewed comments following the May/June 2020 online hearing and developed responses to the most common concerns. With all users of the PMS having instant access to all available data, the system has given the District pavement designers and engineers an extensive toolbox at their disposal. With traffic detoured to the half-interchange at Seltice to the west, how will drivers access the freeway with the extra traffic? 0 HyTSwoc [5laQIBHADED2mtFOE.c}088GNg9w '0 Jb It is the sole responsibility of the user to determine the usability of the data for their purposes. Elected in May, Tyler was sworn in on July 7. However, because of the new restrictions, the cost-saving caveat was lost. endstream endobj startxref Lakes Highway District, Post Falls Highway District, and East Side Highway District . The speed limit will be lowered to 55 mph on, Intermittent lane restrictions will occur on I-90, An extra through lane in each direction on SH-41, A raised curb on SH-41 to prevent drivers on side streets from turning left onto the highway, An extra left-turn lane on SH-41 to head west on Mullan Ave, An extra left-turn lane on Mullan Ave to head north on SH-41, 1.3 miles of I-90 pavement reconstruction, SH-41 widening and pavement reconstruction from Seltice Way to 12th Ave, mile of widening and pavement reconstruction of Seltice Way, Upgrades to intersections with three traffic signals, Utilities, drainage, and signage improvements throughout the project limits. A bridge will be added for bicyclists and pedestrians to cross over the westbound off-ramp. 2879 0 obj <>stream The files on this site are provided in their native file formats to assure that the information provided to the public and consultants is the same information used by the Department. The standard graphics files, symbol libraries, font libraries and other resource libraries used are also in native MicroStation file formats. The four highway districts Worley, Post Falls, Lakes and East Side are responsible for maintaining the local highway systems and county roads. Called an offset SPUI, the latest design eliminates the loop ramp, reduces impacts to Seltice Way and achieves the efficiencies of a single-point urban interchange at a lower cost. The Geographic Information Systems (GIS) Section supports all Divisions within ITD. These maps should not be used for navigational, engineering, legal, or any other site-specific use. The realignment of Beck will move it . The. Boise, Idaho 83707-1129, Transportation Asset Management Plan (TAMP). copyright 2023 LAKES HIGHWAY DISTRICT LOAD LIMITS Load Limits have been updated as of 01/18/2023. Address: 5629 E. Seltice Way. The notion of relocating the bridge or redesigning it as a drawbridge had come up, Humphreys said. The underpasses will be well-lit and short enough to see through to maximize visibility and safety. The project was awarded to Scarsella Brothers, Inc. for $78 million. We have three distinct functions within the GIS Section: This program collects information from all local Highway Districts and County Road and Bridge Groups regarding miles of improved local roads that they maintain and are responsible for. The $1.1 million Post Falls Highway District project will straighten the two 'S' curves on the road on the north side of Seltice Way near Stateline Speedway. maximum. Commissioners have several upcoming projects. !2 Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. ft. home is a 4 bed, 3.0 bath property. n`@ Ys@X$,*' The system suggests pavement project choices based on budget constraints and desired deficiency goals, which the engineers balance against needs and their expert knowledge of the system. Two lanes will be open with reduced shoulders. We do this by providing accurate and timely information to ITD, the public, the private sector, and other governmental agencies. administrative responsibility over road rights-of-way is assigned to the Highway District under Idaho Code Section 50-1330. 2023 Idaho Transportation Department | 208-334-8000, Annual Average Daily Travel Application or AADT App. Traffic Volume & Equivalent Single-Axle Load (ESAL) Projection Request Form, Traffic Projection Request Form Instructions, Idahos Historical Markers Interactive Map. The District maintains and improves its highway system in order to provide a well-planned, safe, efficient and well maintained system of roads for our users. If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side. The highway will still shift to the west and pass under I-90. This design will achieve the efficiencies of a SPUI with excellent compatibility with future expansion. All the files for each county are stored in a single zip file. The district receives two-thirds of its budget from sources other than property taxes. ITD will improve the intersection of the SH-41 Trail and Centennial Trail, including a new pedestrian (hawk) signal across Seltice. 7R{L>d.tcsMo~6R"V>@+C1CY69@q2/B,-Cf #R!jCdzsL0 4e\S. 6095 E. Mullan Trail Road . We are no longer providing a downloadable version of this workspace. Questions regarding the use of this information should be directed to the ITD contract administrator. This permit consolidated prior MS4 permits issued individually to Lakes Highway District MS4 and Post Falls Highway District MS4. DUBOIS, Idaho (KIFI)-Multiple highways in Eastern Idaho have closed due to high winds and blowing snow. Beck Road will be improved, as well as the completion of the widening of Prairie Avenue to Highway 41. 726 0 obj <> endobj From 1978, the ITD steadily improved the PPMIS and modified it to meet specific conditions in Idaho. endstream endobj 731 0 obj <>stream The underpasses and overpasses for bicyclists and pedestrians will maintain connectivity, but will they be safe? Please click here to see any active alerts. The 3,560 sq. For additional information please contact: The mission of the Roadway Data Section is to provide efficient collection, analysis, reporting, and retention of valid statewide traffic data. "Over a 20-year or 30-year lifespan of the bond, it would've made it so unrealistic taxpayers couldn't afford to do it," Humphreys said. Monthly and annual reports are also available for most WIM stations. "We have had a balance, but with more homes and businesses in the area the associated tax base increases our revenues.". ;\cPM] eK0lG1?qw?]]5u3T&J"zv8 ~@EqA8>Rsgpcy9M{nEvP*2w?~j4v4x[W.nnuKA~9{QI"` Reasonable efforts have been made by the Idaho Transportation Department (ITD) to verify that these maps accurately interpret the source data used in their preparation; however, a degree of error is inherent in all maps, and these maps may contain omissions and errors in scale, resolution, rectification, positional accuracy, development methodology, interpretation of source data, and other circumstances. The speed limit will be lowered to 55 mph on I-90 and 25 mph on SH-41 and Seltice Way. Work on Prairie will begin in October as soon as funding is received from the state, Tyler said. 1:15-1:25pm 3-4 yrs. Jump to the section that you are looking for by just clicking the link. source: Bing. I believe that at the Post Falls Highway District, working as a team we will be able to continue to provide and strive to exceed the good service Post Falls is accustomed to.. endstream endobj 727 0 obj <> endobj 728 0 obj <> endobj 729 0 obj <>stream hWN#9? "All these east-west roads will relieve traffic issues on north-south roads too," Tyler said. All Rights Reserved. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Children must to bring their own basket or bag for the eggs. %PDF-1.4 % copyright 2023 ITD will work with businesses to maintain access and place temporary signage for construction. If ITD could completely close the interchange, construction could occur much more quickly. Garden Plaza, 545 N. Garden Plaza Court, Post Falls, ID 83854. Modeling shows that once constructed the new interchange will be safer, more efficient and easier to navigate while being compatible with future expansion of SH-41 and I-90. The Idaho Transportation Department owns a pavement profiler van which drives every state highway route every year. The following are exceptions to posted vehicle weight and speed restrictions as allowed by Idaho Code 49-1005: Vehicle weight and speed restrictions shall not apply to emergency vehicles or school buses; Providers of essential services shall be allowed to apply for a permit that will allow the provider to haul half-loads, board during vehicle operations. Please contact the District for more information - (208)-772-7527. n3kGz=[==B0FX'+tG,}/Hh8mW2p[AiAN#8$X?AKHI{!7. %PDF-1.7 % The Prairie Ave Widening - SH-41 to Meyer Rd project limits is primarily the Post Falls Highway District (PFHD) Jurisdiction (0.75 mile section), with a 0.25 mile section within the City of Post Falls jurisdiction. The District is divided into three sub-districts, each represented by a commissioner. NPDES Permit, North Idaho Highway Districts MS4s, #IDS028207 (pdf) (678.33 KB, May 11, 2020) Final stormwater permit for East Side, Lakes, and Post . This information is checked and entered into our GIS system. View more property details, sales history and Zestimate data on Zillow. A new bike path will replace the existing SH-41 bike path to provide access from the Central and Primrose intersection, as well as from the Mullan and SH-41 intersection to the south side of the interstate. Tyler also said in a press release that during the past couple of months, large fee increases were passed on to local developments, also contributing to some of the relief for property taxpayers. Tyler represents sub-district 2 and serves with David Russell, representing sub-district 1, and Lynn Humphreys for sub-district 3. This video information is available to the public at no cost- you can go to the website and view our highways any time you like. 300 lbs Maximum per inch of width for all tires that are not on a steering axle. hb```f``bd``f@ aV `mp````X ``lppP`cf`d 1?m LRP&8@OD 2|/u\Na0O:#3%(omvDCU;2';&T;0qUc"$l%e>8wWP{qST&$@|^+}#{^>ig.V{ H{"Pff")/t(qe Os|>Mhf-~3J8::L4P^#LA`bFDAav The 1:45-1:55pm 8-11 yrs. These files were produced using Bentley Microstation V07.01.04.10 for the year 2002. "It is due to the fact that it is a navigable water form into Lake Coeur d'Alene, and if we built the bridge, there wasn't going to be enough clearance for some of the masts on sailboats.". In 2007, ITD began running our pavement data through the HERS-ST (Highway Economic Requirements System, STate model), at http://www.fhwa.dot.gov/infrastructure/asstmgmt/hersindex.cfm. 1:00-1:10pm Toddlers https://t.co/BqFaq7JtTQ, RT @IdahoStatewide: US 95: Rush hour traffic from Ironwood Drive (Coeur d'Alene) to Lancaster Road (Hayden). The ITD Corporate Workspace is a custom environment designed to facilitate CADD productivity and direct the user to ITD specific standards, workflows and procedures. The Idaho Transportation Departments standard CAD drawings and supporting files are provided in their native MicroStation V8i file format, unless noted otherwise. After construction, the Centennial Trail will pass underneath the interstate and continue north. MLS # 5765584 Lakes Highway District, Post Falls Highway District, and Worley Highway District formed an association named the Associated Highway Districts of Kootenai . Highway District commissioner meetings are held on the first and third Wednesdays monthly at 6 p.m. in the commissioners meeting room at the district office, 5629 E. Seltice Way in Post Falls. The Idaho Transportation Department purchased its first CADD equipment in 1984. A two-way cycle track will be added to the west side of Ross Point, which will also be extended further south by a future project by the City of Post Falls. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. Your Economic Opportunity. This project will improve safety, increase capacity, provide better connectivity to SH-41 and position I-90 for future expansion. The EPA Region 10 proposes to issue a NPDES permit authorizing the discharge of stormwater . Click an incident icon on the map to get more information. "After 36 years as an . Terms of Service | Privacy Policy | Cookies, Please note by clicking on "Post" you acknowledge that you have read our. Share sensitive information only on official, secure websites. Automatic Traffic Recorders (ATR) These are permanent roadside systems which collect a variety of traffic data. An underpass will be added for the bike path to cross under the eastbound on-ramp. 3300 x 4 tires per axle = 13,200 lbs. Here are some of the most common questions we've received about this project. "We still feel strongly that we need another bridge across as growth and development take place," Humphreys said. Basic CADD Workspace and Files. ATR & WIM Data Elements of this project are being funded with the Transportation Expansion and Congestion Mitigation (TECM) funds as part of Governor Littles Leading Idaho initiative. Bike lanes will be added on both sides of Seltice Way and Mullan Avenue. Monthly Bulletin ATR listing with statistics by route. Traffic Volume & ESAL Projection Report Requests. These reports are maintained by the Idaho Transportation Department Roadway Data Section. https://t.co/z0fdJNSuxM. Coeur d'Alene, ID 83814 ; The EPA previously issued Permit #IDS028207 for discharges from the LHD MS4, and Coeur d'Alene, ID 83814 RT @IdahoStatewide: ID 41: Crash from Prairie Avenue to Hayden Avenue (near Rathdrum). This new software housed a pavement management system (PMS) and a maintenance management system (MMS) to work in tandem as part of the Departments long-term vision for asset management. Each venue will have fun, one-of-a-kind crafts to enjoy and buy. 3 were here. For weekly updates on highway construction projects in Idaho, call the Idaho Road Report at 511 or 1-888-IDA-ROAD (432-7623). The district is seeing substantial new growth revenue from new residents moving to the area but Tyler said the miles of road being maintained by the district remain similar to last year. Although the total GVW with this, size tire is 36,400 lbs., a 10 wheel truck with 11R22.5 tires can NOT exceed by axle: (Steering, axle - 10,000 lbs.) The Pavement Management System (PMS) has allowed ITD to refine the way we calculate and analyze data, by: These new abilities will help Idaho become an efficient practitioner of preservation-first pavement management. If something were to happen to those, the time frame for someone trying to get help would be extended way beyond what is realistic for medical assistance.". ATR systems use several different types of sensors and system electronics to record vehicle volume, length, speed, and some classification data. With the planned expansion for SH-41 and the eventual expansion of I-90, will ITD build noise walls? 2jJ&E3D$RpNkd'{T-UAG@1H1o" QAGO! We are responsible for reporting one of the Departments most important Dashboard Measures, the Percent of Good/Fair Pavement. The ITD Workspace is a set of configuration files, MicroStation and InRoads resource files, documentation, and customized tools, designed to work together to allow for development of a standardized project plan set. Intermittent lane restrictions will occur on I-90 at night. Make sure to keep an eye out for the elusive golden ticket! Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. POST FALLS Commissioners of the Post Falls Highway District announced Thursday the adoption of a 1% property tax cut for next year. Idahos Transportation Asset Management Plan is a tactical-level document which focuses its analysis, options development, programs, delivery mechanisms, and reporting mechanisms on ensuring that strategic objectives are achieved because it acts as a focal point for information about the assets, their management strategies, long-term expenditure forecasts, and business management processes. Theres no dedicated turn lane or signal right now. Bring the whole family. This software contains a robust database that houses several kinds of data, such as bridges, maintenance activities, pavement condition, traffic data, skid data, R-values, boring logs and several others. 25 MPH Maximum speed limit for all trucks whether loaded or empty. Beau.Hansen@itd.idaho.gov. "F$H:R!zFQd?r9\A&GrQhE]a4zBgE#H *B=0HIpp0MxJ$D1D, VKYdE"EI2EBGt4MzNr!YK ?%_&#(0J:EAiQ(()WT6U@P+!~mDe!hh/']B/?a0nhF!X8kc&5S6lIa2cKMA!E#dV(kel }}Cq9 Raymond.Wong@itd.idaho.gov | 208-334-8216 | Short Term Vehicle Count & Studies. Some of the items included in the workspace are: seed files, cell libraries, DGN libraries, line style resource files, all border sheets, plan summary sheets and other sheets, design scripts, settings files, InRoads XIN files, ITD configuration files and documentation. However, the HERS-ST model results had to be mathematically manipulated by hand in order to meet the conditions of Idaho weather, terrain and other factors, which was a painstaking process. Then he hit the ground running with workshops and budget meetings, he said. For online updates, visit the transportation department's road report at 511.idaho.gov. How will construction affect commuters, businesses, and bicyclist/pedestrians? Building the interchange will take through the Summer of 2025. There are 13 WIM systems located statewide. %%EOF Regional transportation planning requires an understanding of the past, recognition of current conditions, and the ability to provide an economically achievable, environmentally balanced, and consumer-friendly transportation system that enables the region to reach its full potential. Data is not available here at this scale. ITD will continue to develop details for the final design and construction. The highway district and emergency vehicles need direct and immediate access to the right-of-way in order to facilitate our response in the event of snow fall or an emergency. Post Falls Festival kicks off July 7 -9. Privacy Policy endstream endobj 730 0 obj <>stream The event will take place in rain or shine. 1:30-1:40pm 5-7 yrs. Movie in the park, inflatables for the kids, and a beer garden for the adults at Q'emiln Park, Post Falls. endstream endobj startxref The signal currently controlling the Ross Point Road, Seltice Way, SH-41 and I-90 intersection will be removed and replaced with a stop sign at Ross Point Road. All files are subject to change without notice. wG xR^[ochg`>b$*~ :Eb~,m,-,Y*6X[F=3Y~d tizf6~`{v.Ng#{}}jc1X6fm;'_9 r:8q:O:8uJqnv=MmR 4 hb```b``f``e``bd@ AG #C" : 4C7-N=n[8, s\b9wTlD9Zb Coeur d'Alene, ID 83814 It is our intention to provide the reader with an accurate and useful review of the historical and current condition of Idahos roads. "We got some information at the last meeting that it is not likely we will overcome," Tondee said. "Some districts gain miles through growth and some lose miles," Tyler said. %%EOF V)gB0iW8#8w8_QQj@&A)/g>'K t;\ $FZUn(4T%)0C&Zi8bxEB;PAom?W= Looking for scenery? A bird's eye view of a Post Falls traffic circle The parade is located on Seltice Way and Car Show & Shine at Post Falls City Hall. "We did have discussions at our last board meeting and received news from the engineer that it is going to be very difficult and not cost-effective to get the bridge permitted by the Coast Guard," Tondee said. Both underpasses will be 14 feet wide and 10 feet tall, which makes them larger than the underpass to access Silverwood off US-95. The Post Falls Highway District is seeking public input on the development of their Transportation Plan. A connection to the neighborhood south of Seltice Way will be constructed. Once constructed, how will the new interchange affect local roads? 101.02. Planning a trip? Access to businesses on SH-41 north of the interchange will remain the same, though a new median barrier will not allow left turns onto or from the highway. Eastbound ramps will pass underneath the interstate to connect with the highway. 208-664-8176. Annually we produce a certification of these mileages for the Department Directors signature. Humphreys concurred, especially with the growth he's seen over the last 26 years on the commission. This permit consolidated prior MS4 permits issued individually to Lakes Highway District MS4 and Post Falls Highway District MS4. P.O. Control of local roads is under Post Falls Highway District, the Cities of Post Falls and Rathdrum, and the Idaho Transportation Department. https://itd.idaho.gov/Dashboard/, For comments, questions and suggestions please call the pavement management engineer at 208-334-8841. They will be having an open house nextTuesday, September 26th from 4 to 7 p.m.at the Post Falls Highway District Office, 5629 E. Seltice Way. ITD will maintain bicycle/pedestrian access through the construction zone. Other changes to traffic control, speed limits and parking may take place after construction by the city as modifications are not supported by traffic modeling. Our department is partnering with the JACC as well so you will have 3 venues to visit. Newly elected Commissioner Chairman Jeff Tyler. Try zooming out or mapping a new location. implementing new pavement performance curves calibrated by ITD engineers, implementing decision trees that mimic District engineering choices, creating performance models that accurately track and display pavement projects, employing an analysis engine that uses integer optimization to maximize benefit, The 1999 Idaho Transportation System Performance Report, The 2000 Idaho Transportation System Performance Report, The 2001 Idaho Transportation System Performance Report, The 2003 Idaho Transportation System Performance Report, The 2004 Idaho Transportation System Performance Report, The 2006 Idaho Transportation System Performance Report, The 2007 Idaho Transportation System Performance Report, The 2008 Idaho Transportation System Performance Report, The 2009 Idaho Transportation System Performance Report, The 2010 Idaho Transportation System Performance Report, The 2011 Idaho Transportation System Performance Report, The 2012 Idaho Transportation System Performance Report, The 2013 Idaho Transportation System Performance Report, The 2014 Idaho Transportation System Performance Report, The 2015 Idaho Transportation System Performance Report, The 2016 Idaho Transportation System Performance Report, The 2017 Idaho Transportation System Performance Report. 742 0 obj <>/Filter/FlateDecode/ID[<8DA741729C3DEF91A9C729890EC3DCE5><8DD474104A7D1E4CB77CA3787F42B7BF>]/Index[726 34]/Info 725 0 R/Length 90/Prev 1417335/Root 727 0 R/Size 760/Type/XRef/W[1 3 1]>>stream Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000 | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000 These maps are distributed as is without warranty of any kind. Ramps will meet at a single point just north of the interstate. Clearing low hanging branches, limbs, shrubs and plants will allow road maintenance crews and civilian drivers a better view of obstacles on and near the road. Click the arrows to the left to see all updates from early design to construction. Construction may be noisy and dusty. Files are not translated to other CAD file formats (.iges, .dxf, .dwg, etc.) Mark your calendars and join us for the Biggest Weekend of the Summer. Other projects on the highway district's radar include connecting Poleline Avenue to Hanley Road, connecting Mullan Avenue to Nez Perce Road and connecting West Nagel Road to Greensferry Road. It was tested and refined by both ITD and consultant contract. 759 0 obj <>stream During snow storms, the buildup of snow and ice on trees branches can cause them to hang significantly lower than normal and may cause them to break off in the road. Right-of-way clearing is an ongoing project that promotes safe and efficient operations of the highway district. Post Falls Highway District is a quasi-municipal government entity governed by a three-member board. Permit expires: September 30, 2025. The inside of the underpass under the I-90 westbound on-ramp will be visible from Seltice Way, and the underpass under SH-41 will be visible from Primrose Lane, which will help improve safety and ease of patrolling. There is a broad range of annual, monthly and specialty reports available for both ATR and WIM systems. During the last PFHD meeting on Feb. 17, the district was presented information by HDR Project Manager Daniel Baker that the U.S. Coast Guard wouldn't permit the proposed bridge. The westbound off-ramp will be elongated and will not curve. After being shifted, the highway will connect with Seltice Way at Herborn Place and be controlled with a signal. In no event shall ITD have any liability whatsoever for payment of any consequential, incidental, indirect, special, or tort damages of any kind arising out of the use of or reliance on the geographic data or metadata. Divisions: Nighttime work will require lighting. The decision will likely be made before 2019. Still, the initial reasoning for the Greensferry location was that it would save taxpayer money by using the 50 feet of right of way already owned by the highway district. Maintaining the Right-of-way enables our district to meet its objectives of protecting the integrity of the road, effectively responding to emergency situations, and helps increase community safety. A .gov website belongs to an official government organization in the United States. Transfer of permitting authority to Idaho. After a neighborhood meeting on the project in September, PFHD Commissioner Terry Werner told The Press that the district has talked about putting a bridge back at Greensferry for about 27 years. This certification is then used throughout the following year to distribute State Highway Distribution Account monies to each of the local jurisdictions on a quarterly basis. The IPlan Map is interactive and includes these detailed layers: Contact: Geographic Information Section | Idaho Transportation Department | Email: GIS-info@itd.idaho.gov. Mailing List LHD staff will be sending out email updates when we make changes to load limits in our district. Example: A tire size marked 11R22.5 is 11 inches wide. *ATTENTION: ITD is now using a managed workspace inside of ProjectWise. ), SPRING BREAK-UP HAULING APPLICATION (PRINTABLE). ITD is continuing coordination with local jurisdictions, and after evaluating public comments submitted after the open house, will select an alternative--whether it be the single-point urban interchange or the half-diamond interchange--to pursue. Secure .gov websites use HTTPS (Front drive axle - 13,200 lbs.) Failure to comply with the conditions of this permit will. Post Falls Highway District Transportation Plan Update. For more information, visit Idaho Pollutant Discharge Elimination System (IPDES) Program. Because the interchange will be shifted north, there will be fewer impacts to the local system. 2y.-;!KZ ^i"L0- @8(r;q7Ly&Qq4j|9 Load restrictions have been revised for the south side of Spokane River. "We were jumping through the hoops, and when we got to the Coast Guard, that is when we got the news that they wouldn't permit a bridge across the river," Humphreys said. An official website of the United States government. Your Safety. Please see the website for a compete road list and map. entitled to apply for essential service permits: providers of heating fuel and propane; hay or feed providers; These are easier. Our long term vision is to include a summary of the status of all transportation in Idaho, with the cooperation of our partners in Idahos cities, counties and highway districts.