Pipe should be stored in an out of the way location where it will not be damaged. The fill above the top of the regular backfill shall be installed and completed as specified for embankment construction. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Public Involvement Manual. The middle of the bedding, should be loosely placed and not exceed 8 inches. The Soils and Aggregate Inspector Certification Course is designed for those individuals responsible for the sampling and testing of soils and aggregates used in base, subbase and roadway embankment construction. It is not appropriate to leave a bench of native soil alongside the pipe during construction. The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Find the right form for you and fill it out: VisitingProfessorofLaw,StanfordLawSchool(W No results. Participated in traffic . Care must be exercised to ensure placement and compaction of the embedment material in the haunches. SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No. Computer-based testing (CBT) allows NICET to extend several benefits to our customers: more flexible exam dates and appointment times; immediate scheduling and confirmation; and quicker exam scoring. Haunching material may be Class 1 and must be placed and compacted in 6 inch loose/4 inch compacted maximum lifts, compacted to 95 percent standard proctor density. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20, RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover, SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. SUMP DRAINS 7-3 7.3. Geotechnical Design Parameters for Retaining Walls, Sound Barrier Walls and Non-Critical Slopes. Effect of Rock-Sized Aggregates on Soil Compaction Results . %PDF-1.4 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. The spigot end of the pipe contains a confined groove for the gasket to seat, where an o ring gasket is placed. The gradation is the distribution of various particle sizes within the material. What is the moisture content at which soil can be compacted to its maximum dry density with the least amount of comparative effort called? %PDF-1.5
%
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Place sample in container and weigh. We developed this course with the input of 30-year inspection managers, engineers, and other industry experts. Importance to Maintenance & Water Quality. VDOT Soils and Aggregate Compaction: Chapter 2. bored but can't be bothered to do anything. The Contractor shall report findings of foundation exploration to the Engineer for approval prior to placing pipe. Bierolson. Silt tight joints provide protection against infiltration of the backfill material containing a high percentage of fines, and typically utilize some type of filtering or sealing component, such as an elastomeric rubber seal or geotextile. Computation of U.S. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for, CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL, Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. The requirements for pipe material and installation in sewer and drainage collection systems. Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. Description. In a saturated soil, the voids are entirely filled with water. Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL. Manhole Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) 5 ft. = Depth of Backfill below top 5 feet 1) 9 ft. 5 ft. = 4 ft. 2) 4 ft. x 3 lifts/ft. 322 0 obj
<>stream
Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. How many blows does each layer require? Currently VDOT certified or Mid Atlantic Regional Technician Program (MARTCP) in the following disciplines: - Expected VDOT Certifications Soil and Aggregate Field Compaction Asphalt Field Hydraulic Cement Concrete Field Pavement Marking Flagger Certification Certification & Issuing Agency Soil and Aggregate Compaction - VDOT or NICET LEVEL II* 11) Pipe openings in precast drainage structures shall not exceed the outside cross sectional dimensions of the pipe by more than how much? 6) Where can the typical underdrain drawings be found? Unsuitable or unstable foundations may be undercut and replaced with a suitable bedding material, placed in 6 lifts. Testing is no longer mandatory on the last day of class. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes, Note: The text must be edited to suit specific project requirements. Students must bring valid ID & attend class in order to test. Do not compact. VDOT states 75 years for higher functional classification roads and 50 years for lower functional classification roads. Length of run = 856 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 3) (36 in. Download. Soils will not need to obtain a VDOT Soils and Aggregate Compaction Certification. This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. What is compaction? A compacted soil has a reduced rate of both water infiltration and drainage. Concrete Field 1. American Water Works Association When standing water is in pipe foundation area, No. Try Now! J\b 0). Trench excavation, backfill, and compaction; Section 02250. 57 stone MUST be capped with a minimum of 4 crusher run prior to placement of pipe or box culvert. These heavy loads can cause considerable damage in flexible pipes and can cause D load cracking in rigid pipes. In a flexible pipe this zone must protect the pipe from distortions due to loading extend to 12 above pipe. SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE, STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. TABLE OF CONTENTS. The moisture content at which a soil can be compacted to its maximum dry density with the least amount of comparative effort is called the optimum moisture content. Trench widths may be varied, based on the competency of the in situ soil, backfill materials, compaction levels and loads. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. 2016v1.0 Chapter 4 12, 13 Typical Pipe and Box Culvert Backfill: BACKFILL TESTING FREQUENCIES Test Location 4 Compacted Lift Foundation One test per lift on alternating sides of the pipe for each 300 feet of pipe or portion thereof. When moving concrete pipe you should pick it up by one end. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials, To make this website work, we log user data and share it with processors. = 15 lifts 5) 15 ifts 2 (one test every other lift) = 7.5, round up to 8 tests in the top 5 ft. of backfill 6) Total tests required = (Number of test below 5 ft.) + (Number of test above 5 ft.) 7) = 11 tests required (minimum) NOTE: Compaction Tests are required on stone backfill (Class I backfill and bedding material); consult the District Materials Division for Maximum Dry Density and Optimum Moisture Content targets for the specific material being used. Cracks shall be digitally scanned to allow for accurate measurement. SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC. 500 grams is the minimum sample required for soils and for aggregate the sample size depends on the Nominal Maximum Size Aggregate. hbbd``b`$CC`q@ &H" 57 stone is not required; seat stone in trench. 13) What is the maximum allowed crack size of a rigid pipe? The pipe should be stacked and chocked to avoid movement of the pipe. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works, SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. The following drawing provides typical VDOT standards for pipe bedding and backfill. C. Section 014510 TESTING LABORATORY SERVICE. ACI Concrete. There is a variety of pavement under/edge drains in the VDOT Road and Bridge Standards Volume 1 ( ) with each addressing a specific geometric condition and groundwater condition. 2. Install Pipe The grade of the pipe should always be monitored during installation. VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . (Provide three) a) b) c) 2) Explain when a rock correction is utilized and what happens to the laboratory maximum dry density and optimum moisture values after a rock . Civil. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. 12) How long after installation is complete can the video inspection can be done? 2016v1.0 Chapter 4 19, APPENDIX K PIPE INSPECTION **Virginia Test Method 123** Post Installation Inspection of Buried Storm Drain Pipe and Pipe Culverts June 25, 2010 SCOPE For all roadway projects that are constructed by private, SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains, State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary, SECTION 724 PIPE CULVERTS 724.1 Description. 8 in. To use this website, you must agree to our, SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701), State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS, SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS, Wastewater Capital Projects Management Standard Construction Specification, Section 02702 SEWER PIPE INSTALLATION AND TESTING, SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION. 3) What are the testing requirements for backfilling around pipe? hb```f````2X@(
[
$ The compaction equipment will ride on the native soil and not allow for proper consolidation of backfill. stream
SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown, 402.02 Section 402. bKjL,gBZqa>,\w Clearly the pipe needs to function as a conduit, as the whole idea of a pipe is to move liquid in a controlled manner and direction. If the inspection is conducted by video: The video camera must have fully articulated lenses (360 degree inspection). 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by. %%EOF
'i$%qyI4[hmrZF 4Obz:;q"ZIE0~^I!)s6E@DCVj'1ey(IL#"`L.>G'@>{7&l0. SECTION 02530 STORM DRAINAGE STRUCTURES. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, Click here to access guidelines for the VDOT Materials Certification Schools Program (Section 114, Manual of Instructions), ACI Concrete Field Testing Technician Certification Program Schedule, Nuclear Radiation Certifications can now be obtained online through third party vendors, Pavement Marking (only available as an online course), Asphalt Plant Level 1 - Physical demonstration of proficiency -scheduled byGermanna CC, Asphalt Plant Level 2 - Physical demonstration of proficiency - scheduled by Germanna CC, Asphalt Plant Mix Design - Physical demonstration of proficiency - scheduled by Germanna CC, Concrete Field - Current ACI must be submitted to, Soils and Aggregate Compaction - Physical demonstration of proficiency - scheduled by CCWA. Students must bring valid ID & attend class in order to test. PurRoses 1. waste aggregate )-4CWP( 4% ceramic waste pow der) represents a 10% aggregate substitution with ceramic waste. 3) 104 in. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including, BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. 4 in.) = 108 in. Conditions of Use Type of Inlet Protection, INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining. The most common underdrains are known as UD 4 and UD 7. Generally excavated embankment material is used as the final backfill. Drop Inlet Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) x 12 inches /foot = Depth of backfill in inches 1) 9ft. 2) Mechanical compacting ram: If a mechanical compacting ram is used, it must be calibrated to produce results 3 ft. hYoF#4rPzL@]Gb)3d@pa@sc/IK^0@Qq. A drained pavement structure has a higher bearing capacity that can effectively support traffic loadings, and lead to long lasting pavement at the least maintenance cost. (Make a Mark on Outside of Pipe) Moving pipe around after joining may cause pipe joint to work apart. This section covers excavation and trenching work and shall include the necessary clearing, grubbing, and preparation, BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. True or false: Open graded aggregates are used in pavement to give the structure more strength. Fully insert pipe. kYPPc^KZ\"}JT9VBd[
/Le UJs]VOk:SZ For registration assistance, questions or concerns, please contact: The MCS courses are currentlybeing delivered through a partnership between VDOT, the Virginia Education Center for Asphalt Technology (VECAT) with Germanna Community College (GCC)and the Community College Workforce Alliance (CCWA). Drawings and general provisions of Contract, including General and Supplemental Conditions and Division 1 Specification Sections, 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid, How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS, Storm Sewer Trenchless Upgrade Alternatives and Recommendations, SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795). Having one of these functions without the other is worthless. When backfill is below spring line of pipe, compact next to pipe first and work towards the trench wall. Importance to Maintenance & Water Quality. Suggested participants would include contractor and supplier quality control personnel, consultants, testing firms and agency . Cleaning, Inspecting, and Testing Sanitary Sewers B. 0
Trenching should be completed in existing soils with sidewalls reasonably vertical to the top of the pipe. A review of the proper minimum/maximum height of cover for the specific type of pipe should be completed. ), Index. What term describes the distribution of various particle sizes with the material? Structural Fill See Section (A)(2)(g) of the Road and Bridge Specifications for complete requirements for backfill material. Get the free VDOT Soils and Aggregate Compaction Description . Fine particles are more sensitive to the presence of water than coarse particles. VDOT Soils and Aggregate Compaction 2016v1.0 Chapter 1 | 1 What classification systems does VDOT use to classify soils? 1) Metal pipe gauge: Examples 12, 14, 16 2) Metal pipe corrugation dimensions: Examples 2 2/3 x ; 3 x 1 3) Concrete pipe strength: Examples Class III, IV or V 4) ph and Resistivity needs to be known by designer 2016v1.0 Chapter 4 5, 6 5) Maximum height of cover: Maximum height for each type of pipe must be given Compare information from drainage summary with maximum cover chart for pipe to be used Check standards for minimum height of cover Measuring Metal Pipe Corrugation example 3 x 2 3 2 Examples of concrete pipe stamp: They typically include manufactured date, diameter, pipe type, class, place of manufacturing. Rock more than 2 inches in its greatest dimension shall not be placed within 12 inches of pipe. Test pattern is to begin after the first 4 lift above bedding and continue to 1 foot above top of the pipe. MANHOLES 7-4 7.5. Highway Plan Reading Guide. As stated earlier, soils are made up of many different types, shapes and sizes of particles. 200 sieve (75 micrometers). 1.02 REFERENCES, PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and, SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Block and gravel inlet Protection (Temporary) 6.52.1. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. 2. Construction loads often exceed design loads. (Zero Air Voids = ZAV). <>
If vibratory rollers are used in the backfill operations, vibratory motors shall not be activated until at least 3 feet of backfill has been placed and compacted over the pipe. In construction, this is a significant part of the building process. How far should the hammer fall?, What are the moisture and density content corresponding to the peak of the curve . When planning a pipeline installation, there are 2 key functions that we must design the pipeline to provide. Materials Notebook Resource Document (pdf 2 MB) March 16, 2015. STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. endstream
endobj
startxref
295 0 obj
<>/Filter/FlateDecode/ID[<8B56AE6A42E26944BC3979D310C9B904>]/Index[282 27]/Info 281 0 R/Length 72/Prev 509365/Root 283 0 R/Size 309/Type/XRef/W[1 2 1]>>stream
Your one-stop source for VDOT maps, data and project info. The mandrel shall be fabricated of metal, fitted with pulling rings at each end, stamped or engraved on some segment other than a runner with the nominal pipe/culvert size and mandrel outside diameter. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. VDOT: Soils and Aggregate Compaction. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer. SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering.
It is generally easier to install due to less stringent lubrication requirements for the gasket. As a reminder, all certification courses are available either online or through a self-study option at the respective community colleges. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. AASHTO M 145 The Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes. 142 0 obj
<>/Filter/FlateDecode/ID[<40D256C358E2674187D5A8FC321FC95C>]/Index[129 27]/Info 128 0 R/Length 70/Prev 587873/Root 130 0 R/Size 156/Type/XRef/W[1 2 1]>>stream
VDOT Soils and Aggregate Compaction: Chapter 3. The above components are designed to perform three functions to aid in draining water from the pavement; these are: Intercept Collect Discharge Following is a general guide on the installation of underdrain/edge drain systems: 1) Excavate trench making sure the side walls are stable 2) Remove any sloughed materials from the trench 3) The dug out material is picked up with conveyor belt and loaded in trucks or piled on one side then picked up by a front end loader. The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. Topics include permits and fees, trench widths, pipe laying, bedding, initial, SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Bell and Spigot: A pipe with a flared bell has the outside diameter of the bell larger than the outside diameter of the pipe. This type joint gasket combination provides a leak resistant joint. Links may open in a new window. When backfill material is above the spring line of the pipe, start at the trench wall and work towards the pipe. If you have questions, please provide us with the course title and number when e-mailing or calling. 5) Open only as much trench as can be safely maintained by available equipment. Compaction testing on No. 1100 SLIP-LINING SANITARY SEWERS, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST, LS 2540 SEWER LATERALS AND INSPECTION TEES, CLEANING, INSPECTION, AND TESTING OF SEWERS, SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING, Beacon Hill Sewer District Standard Specifications. hV[oH+hz3HJ 9) When can No. CON 310 Soils and Aggregates (Soils and Compaction) Homework Name:_____ 1) Why is it important for material testing technicians understand how to perform both the nuclear density test and the sandcone test for compaction testing? What is the minimum number of density tests that should be run on the backfill material? 402.02. The contractor shall be responsible for repairing any damages, Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the, SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing, SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. A REVIEW OF THE USE OF RECLAIMED ASPHALT - Read online for free. 1. Shop drawings, 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction, SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A.